Showing posts with label Lovell Road. Show all posts
Showing posts with label Lovell Road. Show all posts

Monday, 5 December 2011

Minor Highways issues within Kings Hedges


As you might have picked up from the minutes of the Cambridge Area Environment and Traffic Management Committee (no? It's a riveting read) Cambridgeshire Highways used to have a list of all the open highways issues in each division (split into unfunded and those with an identified means of funding) which would come to the AJC meeting, be discussed (usually added to) and then would be back in the hands of officers who would get done what they could, identifying new streams of funding if possible, and then report back to the next meeting of the AJC.

As you can see it's a fairly simple process but doesn't actually add a lot of value as a) most of the work is done by officers and (in my view more significantly) b) it encourages Councillors to get things added to the list that won't ever get done. Basically anything that doesn't have an obvious source of funding, isn't a legal requirement, or isn't part of some bigger project is just not going to happen.

The list, after a few years of b), is now pretty long and some of the the reasons why some of the items are sitting on the list have been lost in the mist of time.

Clearly it's time for a change and so the County Officers are now proposing that they spend some time in each Division with local members and prepare a list of highways issues relevant to that division.

In light of that I've been looking at the highways list we already have for Kings Hedges and the new items that people have already suggested (note that in some cases it is a problem that needs a solution rather than a solution!) and come up with the following list;

  • 20mph speed limit on Northfield Avenue (outside KH Primary School), 
  • Coach parking on Woodhead Drive, 
  • Car parking on Lovell Road, 
  • Arbury Road cycle path (specifically doing something around the Milton Road junction), 
  • Verge parking on Milton Road, 
  • Pavement parking across the division,
  • Traffic improvements on Arbury Road outside the Manor,
  • Verge parking on Hawkins Road, and 
  • Cycle route on KH road (specifically around CRC junction)

That's just off the top of my head. What else do you think should be on this list?

Wednesday, 19 October 2011

Planning application in Milton Road

After a little break from us the weekly list of planning applications is back.

Just one to report this week:for "Installation of two fascia signs and one pylon sign (all internally illuminated)." at 383 Milton Road. The online planning system now seems to allow direct links to the application, so if you need more details follow that link.

383 Milton Road is in the stretch between the Lovell Road and the bus way on that side of the road.

As always in case of difficulty contact the team, and for more information see the Development Control pages of the City Council website.

Monday, 9 May 2011

Planning application on Lovell Road

First planning app to report for a little while.

There is an application for a a single storey ground floor extension to the rear of 105 Lovell Road. The reference number is 11/0397/FUL.

As always you can get more information from the City website, and in case of difficulty contact the team.

Tuesday, 26 October 2010

Another planning app in Lovell Rd

This weeks weekly list has an application for a "two storey pitched roof extension with associated works" at 36 Lovell Rd. The application number is 10/0967/FUL, and details can be found in the usual places. In case of difficulty contact the team.

Monday, 9 August 2010

Planning on Lovell Rd

No planning applications last week, and just one this week.

It is for "Extension of time for implementation of 07/0484/FUL for first floor rear extension", that is to say a previous application is about to expire. This application has reference 10/0577/EXP. More information on it can be obtained at the public access, or in person. See the city council's development control pages for more info.

As usual, in case of difficulty contact the team.

Monday, 26 July 2010

Planning weekly list: Lovell Rd, Kirkwood Rd and Milton Rd

Three items on the weekly planning list this week.

The first is an application for a certificate of lawfulness for a roof extension at 37 Lovell Road, application 10/0604/CL2PD. The second is for "installation of window openings" at Unit 7 on Kings Court, Kirkwood Road. This is application 10/0676/FUL.

The third item on the weekly list is tree works on Milton Road. Number 392 has applied to do work on a Copper Beach and a Lime, in both cases to "raise to 3.5m and crown thin by 20%". Application number 10/192/TREE1.

As usual more information is available from the Development Control website, and in case of difficulties contact the team.

Wednesday, 14 July 2010

Planning applications last week and this

Three applications on the weekly list, two last week and one this week.


Last week there was an application for a two storey side and rear extension to 41 Lovell Road (reference 10/0507/FUL), and an application to vary "condition 28" of a planning application for the erection of industrial units in Kings Court (off King's Hedges Road) (reference 10/0552/S73).


This week is another extension in Lovell Road, this time two storeys to the rear of 36 Lovell Road (reference 10/0581/FUL).

More details can be found on the City Council web site.

Tuesday, 20 October 2009

Planning app on Lovell Road

It is Tuesday so it must be planning application time!

This week there is one in KH, on Lovell Road for a "single storey and first floor rear extensions" to number 36. The reference is 09/0924/FUL.

As usual more information can be obtained from the Development Control people at the City, or by contacting the team.

Friday, 8 August 2008

Give us our Bus Stop back!

The works on the Guided Busway junction for Milton Road have led to the closure of the bus stop with no alternative bus stop provided.

This is causing problems for elderly, ill, or families with young children who rely on this stop.

Cllr McGovern raised this issue at the Guided Busway Local Liaison Forum last night and was told that no suitable alternative site could be found. However the suggestion of a temporary stop on Greenend Rd for the Citi2 service seemed not to have been considered.

Your Focus team have written to Bob Menzies, in charge of the Busway project, and Andy Campbell, the MD of Stagecoach in Cambridge, to ask that the situation be re-examined.

Guided Bus works update

On Tuesday the gantry that lays the the guided busway reached Milton Road. It has now started back towards Longstanton during which time it will make the changes needed at the junctions.

So the good news is that the noisiest stages of construction (ground levelling and guideway laying) are finished as far as this section of the guideway are concerned.

The bad news is that this doesn't mean the work is finished.

Firstly the guideway needs some work. Bob Menzies, the County Council officer in charge of the project tells me that the work so far
"will just leave the stops, guideway infill, cycleway and landscaping
to do. None of which are particularly noisy."


Secondly the work on Milton Road itself continues. This has been delayed by delays in utility companies "diverting the services" (i.e. moving cables and pipes). This is now expected to take another 2 weeks or so according to the representative of Nuttall at last nights Guided Busway Local Liaison Forum. After that there is about 7 more weeks of work.

In the mean time we don't have a bus stop for residents of Lovell Rd. Cllr McGovern has written to Bob Menzies and Stagecoach about this issue. A suggestion that a temporary stop be positioned on Greenend Road was received positively at last night's meeting so watch this space for more news.

Thursday, 3 July 2008

Guided busway nearly at King's Hedges

The construction of the Cambridgeshire Guided Busway (CGB) is expected to reach the A14 by the weekend. The current schedule will have the Gantry (the machine that places the preformed blocks into position) reaching Milton Road in August, which means that the construction work on the main busway will hit King's Hedges soon.

We already have the start of work on the Milton Road end. This current work is apparently "utility companies excavating for utility diversion" and the construction of a new footpath.

I've just attended a meeting of the "Local Liaison Forum" for the Busway. At this meeting the County officer in charge, Bob Menzies, said that the main disruption caused by the building in other sections was in the ground works: the digging and compression of the land prior to the gantry arriving. Residents of Histon have found other problems as well!

Please get in touch with us if the development causes you any problems and we shall see what can be done to minimise (or better yet stop) the disruption.
Published and promoted by Andy Pellew, Mike Pitt, Neil McGovern, Simon Brierley and the Cambridge Liberal Democrats, all of 16 Signet Court, Swann Road, Cambridge.

Comments are unmoderated and do not represent the opinion of the blog owner. We reserve the right to delete massively off topic, commercial, defamatory or offensive comments but will do this only sparingly.